Extreme homemakeover part 2: flooring

As said in previous post, once the walls, ceiling and woodwork was finished it was time to put in the new floor. The floor would be the same click laminate used in the hall wich I installed last year; Oxford oak with a V-groove.

In total it only took me 4 days, working on my own, including removing the old floor (ok.; minus the edges, which I had to remove before painting the original plinths), laying the full floor without removing the furniture out of the room (!!), and finally add the plinths.

now let the pictures to the talking ;)